American Nuclear Society
Standards Subcommittee 8
Home Page

ANS-8 Home
Who We Are
ANS Standards
Clarifications
Meetings
Products & Projects
Site sponsored by WSMS

Questions about site content?
Contact
John Schlesser

Technical support questions?
Contact
Webmaster

Site last updated 8/23/2002

Products & Projects


PRODUCTS

Standard Title ANSI Approval*
ANS-8.1 Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors 1998
ANS-8.3 Criticality Accident Alarm System 1997
ANS-8.5 Use of Borosilicate-Glass Raschig Rings as a Neutron Absorber in Solutions of Fissile Material 1996; Rf 3/06/02
ANS-8.6 Safety in Conducting Subcritical Neutron-Multiplication Measurements In Situ 1983; Rf 7/23/01
ANS-8.7 Nuclear Criticality Safety in the Storage of Fissile Materials 1998
ANS-8.9 Nuclear Criticality Safety Criteria for Steel-Pipe Intersections Containing Aqueous Solutions of Fissile Materials Withdrawn
ANS-8.10 Criteria for Nuclear Criticality Safety Controls in Operations with Shielding and Confinement 1983; Rf 2/4/99
ANS-8.12 Nuclear Criticality Control and Safety of Plutonium-Uranium Fuel Mixtures Outside Reactors 1987; Rf 3/20/02
ANS-8.15 Nuclear Criticality Control of Special Actinide Elements 1981; Rf 9/12/95
ANS-8.17 Criticality Safety Criteria for the Handling, Storage, and Transportation of LWR Fuel Outside Reactors 1984; Rf 3/20/97
ANS-8.19 Administrative Practices for Nuclear Criticality Safety 1996
ANS-8.20 Nuclear Criticality Safety Training 1991; Rf 9/20/99
ANS-8.21 Use of Fixed Neutron Absorbers in Nuclear Facilities Outside Reactors 1995; Rf 7/23/01
ANS-8.22 Nuclear Criticality Safety Based on Limiting and Controlling Moderators 1997
ANS-8.23 Nuclear Criticality Accident Emergency Planning and Response 1997
* USNRC has endorsed all ANS-8 American National Standards, but not necessarily the latest revision, in NRC Regulatory Guide 3.71, Nuclear Criticality Safety Standards for Fuels and Material Facilities, August 1998.


PROJECTS

Working Group Brief Title WG Chair Status
ANS-8.1 M(03) Generic Garcia  
ANS-8.3 M(02) Alarm System Reed At Rf ballot
ANS-8.5 M(07) Raschig Rings Hicks  
ANS-8.6 M(06) In Situ Valentine  
ANS-8.7 M(03) Storage Hopper  
ANS-8.10 M(04) Shielded Facilities Lee  
ANS-8.12 M(07) Mixed Oxides Parra  
ANS-8.14 N Soluble Absorbers Reilly At ANS-8 ballot
ANS-8.15 Rv(03)Xtn Actinides Pruvost WG convened
ANS-8.17 M(02) Fuel Element Safety Kidd At Rv ballot
ANS-8.19 M(01) Administration Carson At Rv ballot
ANS-8.20 M(04) Training Crowell  
ANS-8.21 M(06) Fixed Absorbers Toffer  
ANS-8.22 M(02) Moderation Control Bullington  
ANS-8.23 M(02) Emer. Response Baker  
ANS-8.24 (N) Validation Busch PINS Approved
ANS-8.25 (N) Postings Couture PINS submitted
ANS-8.26 (N) NCSS T&Q Morman PINS Approved
ANS-8.27 (N) Burn-up Credit Lancaster PINS in development
Legend: M = Maintenance; N = New; Rf = Reaffirmation; Rv = Revision; Xtn = Extension